VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. %PDF-1.5 Avoid air entrapment when placing grout. APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. are not concealed by new work. Cut such items flush with masonry surfaces. Protect the structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed. Size and location of all electrical panels. The work to be done under this Division of the Specifications consists of the Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. 16010. ANSI (American National Standards Inst.). SECTION 16010 - GENERAL PROVISIONS. 1.1 GENERAL REQUIREMENTS: A. SEQUENCING AND SCHEDULING Coordinate electrical equipment installation with other building components. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. 2006 0 obj <> endobj This instruction period shall consist of not less than five (5) eight (8) hour days. SECTION 16010 . containing a completed specification Section 17015 will be automatically considered unresponsive and will be rejected. Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. PDF SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL - DeLapp If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. Deliver all certificates to the Owner prior to final acceptance of work. The electrical installer shall utilize a full time project foreman in charge of all electrical work. &. CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. c $ ) p@P ! %PDF-1.5 % English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . h. Design Mix: 5,000psi (34.50MPa), twenty eight (28) day compressive strength. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I ELECTRICAL. @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100. BICSI and NICET certification, where required by these specifications. GROUTING Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. Tools. %%EOF 0000005420 00000 n endstream endobj startxref The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. %PDF-1.6 % 4 | SECTION-16000 1.02 A. If installers are not experienced in procedures, provide instruction by manufacturer's representatives. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. All other materials removed shall become the property of the Contractor and shall be removed from the premises. 4188 0 obj <> endobj endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. Power Distribution System. It is mandatory to procure user consent prior to running these cookies on your website. Reimbursement shall be made by deducting the Architect/Engineer fee from the Contractor's final payment. PDF Section 16010 Part 1 - General NETA (National Electrical Testing Association). 3 0 obj You also have the option to opt-out of these cookies. Install equipment and materials in existing structures. CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. service companies, and controlling agencies. The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. Shop drawings detailing fabrication and installation requirements for electrical equipment. 0000000596 00000 n IL?nL"a n[. Shop Drawings: pdf file format. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. These cookies do not store any personal information. %PDF-1.5 % ` I Examples of Sub Systems: Normal Power. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Safety procedures. 0000001182 00000 n Maintenance. 0000002433 00000 n Remove all electrical clippings, wiring, nuts, bolts, etc. Deep groove ball bearing. left on top of ceilings and ceiling tiles. 0000001525 00000 n Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. CUTTING AND PATCHING General: Perform cutting and patching in accordance with Division 1 Section "Cutting and Patching." B. Room numbers. Provide service and operating manuals for the following: Division 28 Section Digital, Addressable Fire Alarm System. 16010 - Deep groove ball bearings | SKF 4. hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L COORDINATION DRAWINGS General: When required participate in the preparation of the coordinated drawing effort for the project. Servicing. In general, work includes, but is not limited to, the following: Include the following: Planned electrical systems layout, including conduit elbow radii and accessories. Place grout around anchors. 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . %%EOF (ywyK %G=? The drawings and specifications shall be followed in layout of work. B. i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M Test data for equipment, shielded cables and supply voltage shall be submitted to the District. 278 0 obj<>stream 1.01 . In default thereof, owner may have such work done and charge the cost of same to the contractor. 1835 0 obj <>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. 264 15 If you want to know more or to change your cookie settings on your computer or device, please see our cookie policy. General: Construct concrete housekeeping pads to support mechanical equipment were indicated and as detailed on the drawings and as specified herein. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. Section 16151 - Vertical Hollowshaft Electric Motors . hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90 Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. Trouble shooting. Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. Job No. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. 4. [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream See underlined texts for Edits. PDF Abu Dhabi Sewerage Services Company (Adssc) General Specification for In addition to the requirements specified in Division 1, the following requirements apply: Protection of Installed Work: During cutting and patching operations, protect adjacent installations. But opting out of some of these cookies may have an effect on your browsing experience. 5. Record documents. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. . Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . hbbd``b`$f n2 w}L %X0 8 Maintenance agreements and similar continuing commitments. F. Supply Voltage PDF Section 16010 Basic Electrical Requirements Part 1 - Ieua shall meet the requirements of the associated spec section(s). Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. <> Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. Maximum length: (six 6) feet, except where fished. Machine name and specification section number of driven machine. Provide at least forty (40) hours straight time instruction to the operating personnel. hSmk0+q7Pt%i!4GK~ ?lat"=Ye vydw \CnnXVmTG.1IgFb3muJ M6[]\.I!M{S}/Upc_Ov>Il/tc@U(Bvf-+u=oga$a #c.OyY7;njc dQ)lvy 7J As]S97}y9/7Qu{w}Sc1^~w/(omZB;.2 }@qQ Mg=?X2Wqg?p0O/&swW7qrdS&~ `Owe ]NXzN&~hQE2vJcU#BgO# E . endstream endobj 4189 0 obj <. &%`T$cf:A5H(3Jy?'- ] SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190
The Fox Flixton Menu,
Richard M Daley Net Worth,
Should I Get A Mare Or Gelding Quiz,
Reedley High School Football Coach,
Jarrell Tornado Bodies,
Articles S
specification section 16010